Cross River Rail – Clapham Rail yard development

A large crane operates on a construction site next to multiple railway tracks. Nearby are construction materials, equipment, and workers, with buildings and roads in the background under a partly cloudy sky.

Client

CPB led Unity Alliance

Location

Yerongapilly, Brisbane

Equipment

LR1300sx  & LR1350/1

Scope

Clapham Rail Yard – Installation of BR91 & BR93 fly over bridges, install of super T girder and deck units

STATS
A large crane operates on a construction site next to multiple railway tracks. Nearby are construction materials, equipment, and workers, with buildings and roads in the background under a partly cloudy sky.

The Challenge

Our Solution

The Result

Download our Capability Statement

Three brochures for Integrated Heavylift are displayed on a white surface. The covers show an aerial view of a construction site with cranes, while the open brochure reveals text, images, and geometric design elements.