Cross River Rail – Clapham Rail yard development 2

A yellow crane operates next to a large retaining wall under construction beside train tracks, with nearby storage buildings and a suburban neighborhood in the background. Construction equipment is scattered on the site.

Client

Formcon Group

Location

Yerongapilly, Brisbane

Equipment

SCX2000a-2 / AT40 Franna

Scope

Installation of precast retaining walls

STATS
A yellow crane operates next to a large retaining wall under construction beside train tracks, with nearby storage buildings and a suburban neighborhood in the background. Construction equipment is scattered on the site.

The Challenge

Our Solution

The Result

Download our Capability Statement

Three brochures for Integrated Heavylift are displayed on a white surface. The covers show an aerial view of a construction site with cranes, while the open brochure reveals text, images, and geometric design elements.