Cross River Rail – Albert street station

Client

Mulherin

Location

Brisbane CBD

Equipment

LTR1100 / Enerpac Synchoist cylinders

Scope

Construction of over station canopy

STATS

The Challenge

Our Solution

The Result

Download our Capability Statement

Three brochures for Integrated Heavylift are displayed on a white surface. The covers show an aerial view of a construction site with cranes, while the open brochure reveals text, images, and geometric design elements.