Australia Super node – BESS

Aerial view of a construction site with a large red crane and a long red steel structure on gravel, surrounded by trucks, cars, wooden platforms, and several workers visible on the ground.

Client

Siemens Energy

Location

Brendale, Brisbane

Equipment

LR1400 – 400t crawler & Grove GMK6400 (East Coast cranes)

Scope

Trans lifting of 2 x 240t 33kva Siemens transformer from heavy haulage road configuration to SPMT for relocation to final placement with jacking and sliding equipment

STATS
Aerial view of a construction site with a large red crane and a long red steel structure on gravel, surrounded by trucks, cars, wooden platforms, and several workers visible on the ground.

The Challenge

Our Solution

The Result